Study on risk evasion in electricity market: Part one risk evasion models corresponding to the different stages of power market

Xueshun Zhao,Minxiang Huang,Zhenxiang Han
DOI: https://doi.org/10.1109/DRPT.2004.1338030
2001-01-01
Abstract:In accordance with the characteristics of different stages of power market, this paper proposes the different risk evasion models based on the basic principles of future and forward contract. These functional embodiments in electric transactions are analyzed and analytical results demonstrate that the model of future contract for bilateral-transaction is relatively mature model for power market, and further it is efficient for both contractors to take precautions against and avoid the risks. On the other hand, the model of forward contract for unilateral-transaction is suitable for incomplete bilateral open power markets, which helps the generation producers and power pool to evade the risks of spot transactions to a certain degree. The transition model mentioned being in the primal stage of power market, the authorized contract for differences and single purchaser model is simple and easy for implementation, although its ability to evade risk is not optimal and thus limited.
What problem does this paper attempt to address?