Using Recursive Linear Programming To Deal With Nonlinearity In Flexible Pwb Assembly System Redesign

Zhongsheng Hua,Liang Liang,Xiaoyan Xu,Jin Qin
IF: 1.019
2000-01-01
Chinese Journal of Electronics
Abstract:In a multi-product, flexible manufacturing environment, line capacity of printed wiring board (PWB) assembly systems may need to be adjusted at the beginning of each aggregate planning period because of demand fluctuation over multiple periods. A model of equipment changeover scheduling (ECSP) at the aggregate level was developed in [1]. In the described solution procedure, a recursive programming is applied to confine the decision searching space. This paper addresses the impacts of the recursive planning on solutions to ECSP. By analyzing and computing experiments, it is observed that impacts of the recursive planning are twofold: firstly it provides a feasible way to deal with the nonlinearity of average production cost; furthermore, it can improve capacity utilization of the redesign.
What problem does this paper attempt to address?