Design, Manufacture, and Test of a 30 m 10 kV/2.5 kA Concentric HTS Cable Prototype for Urban Grid
Bangzhu Wang,Xiaochen Wu,Hong Xie,Zhining Lv,Zhenzi Wang,Meng Song,Yong Huang,Yajun Xia,Zhe Wang,Tengbiao Chen,Bo Tian,Shaotao Dai
DOI: https://doi.org/10.1109/access.2021.3108199
IF: 3.9
2021-01-01
IEEE Access
Abstract:High temperature superconducting (HTS) cable, with significant low dissipation and massive current carrying capability, is a promising solution for the shortage of transmission capacity in mega-cities. China Southern Grid launched a HTS cable project in 2017 to develop a medium voltage concentric HTS cable system for installation in the distribution grid at urban area in Shenzhen City. It is the first time that concentric HTS cable system is developed and will be the first HTS cable installed in urban grid in China. The cable core mainly consists of three concentric phases winded by YBCO tapes and cold dielectric insulations in between phase-to-phase, phase-to-former, and phase-to-screen. The cable has a rated voltage of 10 kV and a rated current of 2.5 kArms. The critical current ( <span class="mjpage"><svg xmlns:xlink="http://www.w3.org/1999/xlink" width="1.967ex" height="2.509ex" style="vertical-align: -0.671ex;" viewBox="0 -791.3 847 1080.4" role="img" focusable="false" xmlns="http://www.w3.org/2000/svg"><g stroke="currentColor" fill="currentColor" stroke-width="0" transform="matrix(1 0 0 -1 0 0)"> <use xlink:href="#MJMATHI-49" x="0" y="0"></use> <use transform="scale(0.707)" xlink:href="#MJMATHI-63" x="622" y="-213"></use></g></svg></span> ) is at least 6 kA per phase. The outline diameter of the cable core is 76 mm and the cryogenic pipe is 175 mm. As a middle step, we designed and manufactured a 30 m long prototype cable system and it was tested generally according to IEC 63075. For improvement of the manufacture processes, several short cable core samples were made, tested, and dismantled. The ultimate goal of the 30 m prototype is to verify the design and accumulate experience for the installation of the 400 m fully functional cable system in the grid. The test results of the 30 m cable prototype are presented and discussed. The 400 m class HTS concentric cable demonstration project has already started and it is expected to energize in grid in late September, 2021.<svg xmlns="http://www.w3.org/2000/svg" style="display: none;"><defs id="MathJax_SVG_glyphs"><path stroke-width="1" id="MJMATHI-49" d="M43 1Q26 1 26 10Q26 12 29 24Q34 43 39 45Q42 46 54 46H60Q120 46 136 53Q137 53 138 54Q143 56 149 77T198 273Q210 318 216 344Q286 624 286 626Q284 630 284 631Q274 637 213 637H193Q184 643 189 662Q193 677 195 680T209 683H213Q285 681 359 681Q481 681 487 683H497Q504 676 504 672T501 655T494 639Q491 637 471 637Q440 637 407 634Q393 631 388 623Q381 609 337 432Q326 385 315 341Q245 65 245 59Q245 52 255 50T307 46H339Q345 38 345 37T342 19Q338 6 332 0H316Q279 2 179 2Q143 2 113 2T65 2T43 1Z"></path><path stroke-width="1" id="MJMATHI-63" d="M34 159Q34 268 120 355T306 442Q362 442 394 418T427 355Q427 326 408 306T360 285Q341 285 330 295T319 325T330 359T352 380T366 386H367Q367 388 361 392T340 400T306 404Q276 404 249 390Q228 381 206 359Q162 315 142 235T121 119Q121 73 147 50Q169 26 205 26H209Q321 26 394 111Q403 121 406 121Q410 121 419 112T429 98T420 83T391 55T346 25T282 0T202 -11Q127 -11 81 37T34 159Z"></path></defs></svg>
computer science, information systems,telecommunications,engineering, electrical & electronic