Assessment for backwater amount in unsaturated zone in landslide in rainfall process

王智磊,孙红月,尚岳全,赵权利
DOI: https://doi.org/10.3785/j.issn.1008-973X.2013.06.022
2013-01-01
Abstract:To analyze the effect of backwater in unsaturated zone in the process that rain fed the groundwater in landslide, the computing method for backwater amount in rain process and evaluation method for rainfall threshold with the index of backwater were presented. The backwater amount induced by rainfall was deduced from the statistical model which was based on the monitoring data containing rainfall, groundwater level in landslide and water discharge from drainage structure. To make dimensions consistency of the monitoring data from rainfall, water discharge and groundwater level for statistical analysis, a seepage field model of drainage tunnel was established. In this model, the groundwater level variation was related to water release quantity considering the line of seepage in positive slope in uniform flow theory. In the situation of highly saturated, a vector autoregression model was established based on the data from dimensional transformation of groundwater level, monitoring data of rainfall and water discharge in the rainfall process. It could compute theoretical rainfall intensity, so that the backwater amount in the situation of low groundwater level was deduced in the rainfall process. The monitoring data of rainfall, water discharge in drainage tunnel and groundwater level from three heavy rainfall processes in K103 landslide at the Hangzhou-Jinhua-Quzhou Highway were analyzed. The generated backwater amount was calculated and its effect in rainfall infiltration into groundwater was analyzed. It concluded that the rainfall threshold was that the gravity force of backwater amount reaching 60 kN and the groundwater level reached 0.6 m.
What problem does this paper attempt to address?