Experiment of Air and Rail Temperature and Design of CWR Track of Fenghuo Mountain Tunnel on Qinghai-Tibet Railway

ZHANG Xiangmin,GAO Liang,ZENG Zhiping,SUN Yongning,LIANG Fei
DOI: https://doi.org/10.3969/j.issn.1673-0291.2013.03.014
2013-01-01
Abstract:An automatic acquisition and storage system of air and rail temperature suitable for the harsh climate environment on Qinghai-Tibet Plateau was developed.A one-year continuous measurement of the air and rail temperature in and out of Fenghuo mountain tunnel on Qinghai-Tibet railway had been carried out for the first time.The change regularity of the air and rail temperature inside and outside Fenghuo mountain tunnel was obtained.According to the change regularity,the design of fastening down temperature of continuously welded rail(CWR) track for Fenghuo mountain tunnel was finished.The model of CWR track was established by finite element method to study the feasibility of the layout of long rail strings crossing the tunnel.The rail temperature stress and telescopic displacement of CWR track in the rail temperature transition zone near the tunnel entrance were calculated.The results show that the layout of long rail strings crossing the tunnel can be adopted when the length of rail temperature transition zone is around 30-50 m,but a certain number of anticreepers must be laid on the transition zone.
What problem does this paper attempt to address?