Analysis on Excess Pore Water Pressure Induced by Shield Tunnelling in Front of Excavation Face

WANG Zhi-liang,SHEN Lin-fang,XIE Jian-bin,YAO Ji
DOI: https://doi.org/10.3969/j.issn.1001-8360.2013.05.015
2013-01-01
Abstract:On the basis of the Mindilin solution,the numerical integration method was applied to calculate additional stress of surrounding soil,which was caused by bulkhead pressure,friction force of shield skin and grouting pressure during shield tunnelling.Considering the influence of additional stress of surrounding soil,the changes of principal stress were obtained by the method of soil mechanics.The Henkel-deduced relationship between principal stress and excess pore water pressures was used to calculate excess pore water pressures in front of the excavation face.Combining with an example,distribution of the excess pore water pressures within a certain range in front of the excavation face induced by bulkhead pressures,friction forces of shield skin and grouting pressures was analyzed.The results show as follows: On the premise of the assumption and sampling,referring to the respective influence of the three construction factors,i.e.,bulkhead pressures,friction forces of shield skin and grouting pressures,the laws of distribution and regions of the induced excess pore water pressures are essentially approximate;the closer to the excavation face,the larger the excess pore water pressure and the faster its reducing speed;in terms of magnitude,the excess pore water pressures are the first when induced by friction forces of shield skin,the secondary when induced by bulkhead pressures and the third when induced by grouting pressure.
What problem does this paper attempt to address?