Mechanism of Voltage Control Mismatch Between Provincial Power Grid and Regional Power Network and Its Three-Dimensional Analysis

LI Jianhui,LIN Jianxi,WU Guobing,YANG Yinguo,ZHANG Yongjun,CAI Zexiang
DOI: https://doi.org/10.13335/j.1000-3673.pst.2013.05.037
2013-01-01
Abstract:The close-coupled and high-capacitive characters of large-scale power grid are concomitant with its development, it make the reactive power and voltage control more difficult, and as a result the mismatching between voltage control in provincial power grid and that in regional power network appears. Considering the influence of hierarchical scheduling mechanism, the voltage control mismatching is analyzed to obtain the coordination characteristics among control objective, control demand and control capability. A three-dimensional analysis method is proposed to dissect the coordination relation between the voltage control of provincial power grid and that of regional power network in three dimensionalities of space, time and objective and to attain the thinking for the solution of the control mismatching. Combining with the features of AVC/VQC control, a voltage criterion at the 220kV side of transformers in the substations is led into the local corrective control to consider the demands from voltage control in power grid and that in power network to optimize the result of voltage control. The effectiveness and reasonableness of the thinking and strategy to solve this problem are verified by case study.
What problem does this paper attempt to address?