Research on zero-wait scheduling problems in multiproduct processes with due dates

Zhenhao Xu,Xingsheng Gu
DOI: https://doi.org/10.1007/978-3-642-37105-9_36
2013-01-01
Abstract:Production scheduling is an important aspect of batch process operations to achieve high productivity and operability. In this paper, we considered a zero-wait multiproduct scheduling with due dates under uncertainty, where the total weighted earliness/tardiness penalty is to be minimized. The imprecise processing time is expressed with the triangle fuzzy variable and the model has been established based on fuzzy cut-set theory. A new improved shuffled frog-leaping algorithm (ISFLA) is introduced to search optimal objective for the given problem, which has a new updating rule in memeplexes. In order to enhance the ability to search the global optimum, the strategy of Forced Moving of the worst frog in each sub-memeplex is proposed to increase the diversity. Simulated results demonstrate that ISFLA has outperformed the conventional SFLA, which is effective and robust in solving the zero-wait scheduling with due-date window.
What problem does this paper attempt to address?