A Multi-Objective Optimisation Algorithm for the Hot Rolling Batch Scheduling Problem

S. J. Jia,J. Yi,G. K. Yang,B. Du,J. Zhu
DOI: https://doi.org/10.1080/00207543.2011.654138
IF: 9.018
2013-01-01
International Journal of Production Research
Abstract:The hot rolling batch scheduling problem is a hard problem in the steel industry. In this paper, the problem is formulated as a multi-objective prize collecting vehicle routing problem (PCVRP) model. In order to avoid the selection of weight coefficients encountered in single objective optimisation, a multi-objective optimisation algorithm based on Pareto-dominance is used to solve this model. Firstly, the Pareto M????MI?? Ant System (P-MMAS), which is a brand new multi-objective ant colony optimisation algorithm, is proposed to minimise the penalties caused by jumps between adjacent slabs, and simultaneously maximise the prizes collected. Then a multi-objective decision-making approach based on TOPSIS is used to select a final rolling batch from the Pareto-optimal solutions provided by P-MMAS. The experimental results using practical production data from Shanghai Baoshan Iron & Steel Co., Ltd. have indicated that the proposed model and algorithm are effective and efficient.
What problem does this paper attempt to address?