Model and Algorithm for the Integrative Scheduling of EMU Utilization Plan and Maintenance Plan

WANG Zhongkai,SHI Tianyun,ZHANG Weijiao,WANG Hui
DOI: https://doi.org/10.3969/j.issn.1001-4632.2012.03.17
2012-01-01
Abstract:To solve the problem of scheduling the utilization plan and maintenance plan of Electric Multiple Units(EMU) for EMU depots,on the premise of known EMU routes,an integer programming model was built for the integrative scheduling of EMU utilization plan and maintenance plan with both EMU utilization routes and the regulations of EMU inspection and maintenance as the main constraints,with the minimization of the quantity of EMU and the cost of the EMU maintenance as the optimization objectives.The feasible utilization path set for EMU was solved according to the possible operation conditions as well as the constraints of EMU inspection and maintenance.Based on this set,the simulated annealing algorithm to solve the model was designed.By analyzing an example,it is validated that the proposed model and algorithm can effectively solve the problem of scheduling EMU utilization plan and maintenance plan.
What problem does this paper attempt to address?