Integrated production planning and scheduling of multi-stage workshop based on alternant iterative genetic algorithm

Fuli Xiong,Hongsen Yan
DOI: https://doi.org/10.3969/j.issn.1001-0505.2012.01.034
2012-01-01
Abstract:In order to improve the operational efficiency of multi-stage production system, an integrated multi-period multi-workshop production planning and scheduling problem is explored. The production system consists of a mixed-batch Job-shop workshop in series with a mixed-model assembly workshop. An integrated optimization model of the production planning and scheduling is formulated based on nonlinear mixed integer programming. In this model the constraints such as material balance, device capacity, and start position, etc., are taken into account and the demand relations between the upstream workshop and the downstream workshop are considered synchronously. The cost objectives of the two workshops can be optimized simultaneously. Then an alternant iterative method by hybrid genetic algorithm is employed to solve it, which operates by the following steps: a plan is given to find a schedule by a hybrid genetic algorithm; in turn, a schedule is given to find a new plan using another hybrid genetic algorithm. Two hybrid genetic algorithms are alternately run to optimize the plan and schedule simultaneously. Simulation results show that the proposed method is feasible and effective.
What problem does this paper attempt to address?