Research on additional stress on adjacent pile foundation caused by double-O-tube (DOT) shield tunnel

Xinjiang Wei,Jie Hong,Gang Wei,Tao Zhang
2012-01-01
Disaster Advances
Abstract:The computing formulas of soil additional stress induced by bulkhead additional thrust and force of friction between shell of DOT shield and soil are derived from Mindlin solution in elastic mechanics. By assuming the soil as the Winkler model, the vertical soil additional stress formula caused by ground loss is derived. The distribution of total additional stresses from bulkhead additional thrust, the friction between soils and shell of DOT shield tunnel and soil loss on adjacent underground pile foundation was researched. The results show that the additional stress variation is a three-dimensional problem closely related to the relative position between the pile foundation and the shield machine. In the thrust direction and the direction perpendicular to the segment, the additional stress changes from tension behind into pression ahead of the excavation face. The additional stress direction perpendicular to the segment has a large extension over the additional stress value in thrust direction. The pile foundation is subject to a small vertical additional stress and in the vicinity of the tunnel axis, there is an additional stress in the opposite direction to both ends showing bow shaped distribution curve.
What problem does this paper attempt to address?