Reliability-Based Optimization of Geotechnical Systems

J. Zhang,L. M. Zhang,Wilson H. Tang
DOI: https://doi.org/10.1061/(asce)gt.1943-5606.0000551
IF: 3.9
2011-01-01
Journal of Geotechnical and Geoenvironmental Engineering
Abstract:Reliability-based optimization (RBO) intends to minimize the cost involved in a design while satisfying all technical requirements specified by using reliability theory. Although this idea is attractive, its implementation is generally difficult because an accurate evaluation of the reliability constraints is often computationally prohibitive when it is coupled with the minimization of a cost function. This paper suggests an indirect method for RBO of geotechnical systems initially on the basis of the mean first-order reliability method (MFORM). Because reliability analysis with MFORM is very efficient, the computational work involved in RBO is greatly reduced. The major concern about MFORM is that it is not an accurate reliability method. A reliability index mapping function was used to relate the reliability index calculated by MFORM to that calculated by a more accurate method. When the mapping function perfectly reflects the relationship between MFORM reliability index and that from an accurate reliab...
What problem does this paper attempt to address?