Particle Swarm Optimization Algorithm for Scheduling Problem of Surface Mounting Process

WU Kai-shun,HAO Jing-hua,LIU Min,WU Cheng
DOI: https://doi.org/10.3969/j.issn.1671-7848.2007.02.006
2007-01-01
Abstract:Surface mounting machine is one of the most important equipments in the PCB surface mounting process,in which the productivity of surface mounting machines could be improved by surface mounting process scheduling algorithms.The surface mounting process scheduling problem comprises two parts of the placement optimization and the surface mounting path optimization of devices.A discrete particle swarm optimization algorithm for solving the surface mounting process scheduling problem is proposed.In the algorithm,a solution representation method and a particle swarm initialization method are firstly designed by means of combining problem characteristics,and then a new particle-updating mechanism is presented,a re-scheduling method for device placement problem is finally provided.Numerical computations using practical data from a large surface mounting enterprise show that the proposed algorithm is effective.
What problem does this paper attempt to address?