Application of Chamber Blasting with Linear Charge in Unstable Rock Risk-elimination

HUANG De-quan,ZHOU Yong,CHEN Jian-feng,LIU Liang-quan,LUO Ying,TAO Jun
DOI: https://doi.org/10.3969/j.issn.1672-7428.2010.01.021
2010-01-01
Abstract:Unstable rock chamber blasting is the first blasting scheme for large volume emergency treatment with rapid construction speed.With detailed geological survey and topography mapping,and with informational instruction,the risk-elimination by chamber blasting was carried in Wushan,287000m3 unstable rocks were eliminated in 46 days.The paper discussed the blasting scheme design,blasting parameter selection,construction technology and blasting effect with the experience.