The Mechanism Analysis and Stability Evaluation of an Expressway Landslide

LIU Jie,ZHAO Xiao,JUN Neng-pan,DENG Hui,ZHAO Jian-jun
DOI: https://doi.org/10.3969/j.issn.1005-3409.2006.03.028
2006-01-01
Abstract:Constructing first-class highway in mountainous area inevitably to carry on deep cuts and high fills-in,which can form massive high steep roadbeds side slope or slope of embankment.Because gneiss original geology environment balance is broken,objectively created geological condition for collapse and slide.The project practice indicated that constructed highway in our country in mountainous area is nearlydoes not have road without collapse,not to have road without break down,in rainy season,the road soil slip,the landslide is specially more common.How therefore correctly knew geological condition mountainous area road side slope,the unique feature,forming mechanism and correct appraisal of side slope stability,has become geological project question in our country mountainous area first-class highway construction.Take a highway side slope as an example,the combination methed of the gology and projectis elaborated in detail,the entire process stability of this side slope is appraised,and based on this,the effective government measure is proposed.The result indicated,after government project implementation,the side slope stability has met first-class highway design requirements.
What problem does this paper attempt to address?