3D numerical analysis of deep excavation for an interchange station of Suzhou Metro

DING Yong-chun,ZHOU Hong-bo,ZHANG Lu-lu
2008-01-01
Abstract:Suzhou Leyuan Metro Station is an interchange station of Suzhou Metro Line No.1 and No.3.The excavation at the interchange part is complex and the excavation depth is up to 25.0 m.Within the depth of the excavation,the main stratum is composed of soft silty clay with high compressibility.A three-dimensional finite difference analysis with FLAC~(3D) was conducted to investigate the performance of the retaining structures during construction of the interchange part of the underground metro station and to provide some suggestions of construction measures.Based on the numerical results,the wall deformation in Zone 1 was complicated due to the boundary effect,and the maximum wall deflection was found to be about 18.8 mm.For Zone 2,the wall deformation was similar to that in plane-strain condition,and the maximum wall deflection was 30.1 mm.