Design and Effect Monitoring of Riverside Vacuum Sewage Interception Project

Jun-tao JIN,Mao-xin YUAN,Jun CHEN,Yun-tao GUAN
DOI: https://doi.org/10.3969/j.issn.1000-4602.2012.02.017
2012-01-01
Abstract:Based on the sewage discharge quantity from the riverside discharge outlets into the Beishi River and the investigation on the geology and topography,the vacuum sewage interception project of the Beishi River was designed,and the effect monitoring was performed.The results show that the system collects sewage of 50 to 220 m3/d with hourly negative pressure leakage rate of less than 5%.The maximum sudden noise during the system operation is 70.3 dB outdoors and 91.9 dB indoors,which meets the requirements of the enterprise and urban regional noise criteria.H2S and NH3 are not detected around the pumping station.So the system has no noise and odor problems.From the point of view of economic investment and interception effect,the vacuum drainage system should not be applied under conventional conditions but should be used under special topographical and geological conditions as a beneficial supplement of gravity drainage system.
What problem does this paper attempt to address?