Application of MCS in Estimating for Project

Hui CHEN,Jian ZHU,Qinghua ZHANG,Shumei CUI,Cuixiang XIN
DOI: https://doi.org/10.3969/j.issn.1008-1933.2007.05.064
2007-01-01
Abstract:As a numerical simulation method,Monte Carlo Simulation has already applied in many fields.Because the estimating for project is uncertain,therefore using Monte Carlo Simulation to analyze the statistic characteristics and risk of the result of project estimating,this will become another applying field with actual meaning.
What problem does this paper attempt to address?