Abstract:The South-to-North Water Diversion Project is a major strategic infrastructure, so it has great significance to assess the risks of their crashes. Aim at the first phase of the Middle Route of South-to-North Water Transfers Project, the failure nodes of various types of hydraulic structures are summarized, and the risk types of the Project are identified and analyzed, getting a engineering risk sheet of the design unit of the first phase Project, which can be a basis for quantitative assessment of the operational risks of the Middle Route.