Evaluation Indicators Research on Central Support Land Remediation Major Project

JIN Xiao-bin,LI Xue-rui,TANG Xiao-lu,ZHOU Yin-kang
DOI: https://doi.org/10.3969/j.issn.1002-2104.2010.07.015
2010-01-01
Abstract:With the connotation of the land consolidation extended and the conception of the land remediation proposed,the working emphasis of the land consolidation project management at national level changed from previous approval and management of general projects to strategy-making of land remediation major project.The current major project is still at the stage of pilot declaration,basically relying on the general project experience accumulation while theoretical basis,method system,technical means and support system of the evaluation and demonstration are not yet perfect,it's and are difficult to adapt to the requirements of orderly management.Furthermore,because the major projects have characters such as large scale,long cycle,high risk,strong systematization and regionality,serious pressure of environmental protection,and significant implementation meaning,strengthening the evaluation and the demonstration before the implementing of major project and making the scientific decision analysis are particularly important.This study starts with the project management phase and administration management procedure,divides the evaluation and demonstration of major project into two stages of project decision-making and evaluation demonstration on the basis of the focus on each stage's evaluation and demonstration,also establishes respectively the characterization declaration qualification,declaration condition, implementation condition,planning target,organizing condition,ecological environment,implementation safeguard,the control requirements of evaluation index system of project construction plan and layout,project estimation and benefit analysis,and implementation plan and management,etc.Moreover,this study discusses the comprehensive evaluation and demonstration in order to provide reference for the further evaluation and demonstration practices of major projects.
What problem does this paper attempt to address?