Design Analysis for Foundation under Spudcan of Jack-up Platform

杜家庆,杜守继,赵丹蕾,唐文勇
DOI: https://doi.org/10.3969/j.issn.1672-1144.2012.06.023
2012-01-01
Abstract:The soft clay in the jack-up platform test site for lifting test is thicker,which may cause the spudcan of drilling platform into mud too deep to lift up,so the method of using the bored pile and caps as the foundation to support the spudcan is proposed.Then,the 3D finite difference program is employed to set up the pile-soil-caps interaction model,and the bearing capacity of the pile groups under preloading and combined loading in ultimate state is evaluated respectively.The results indicate that the pile foundation could meet the bearing capacity and settlement requirements;the pile shaft friction of upper part(below the caps for L/3 distance,L means pile length) is not bigger than half of the ultimate side friction,and the shaft friction of lower part is between half and one time of the ultimate side friction;the proportion of load carried by caps is between 10% and 20% before the settlement of pile groups reaches the value of 5%D(D represents the diameter of the pile).
What problem does this paper attempt to address?