Sequencing Problem for a Mixed-model Assembly Line Considering Switching Constraints

ZHENG Min,Dong Ming
DOI: https://doi.org/10.19495/j.cnki.1007-5429.2012.02.016
2012-01-01
Abstract:This paper discusses a sequencing problem of a mixed-model assembly line when it has auxiliary workers to help completing overload work,considering the walking time of workers reach the next car.The scope of optimization is expanded forward from the assembly shop to the paint shop,and it gives the upper bounds of continuous spraying cars in the same color.Based on this background,considering keeping the constant rate of part usage and balancing workload of sub-assembly workers,a mathematical programming model was built,with the objective of minimizing the painting-switching cost and labor cost.Finally,CPLEX was used to solve the model,and the relationship between the Takt Time and the total cost,length of workstation and the total cost were given.