Analysis on substituting sewage-source heat pump for crude oil heating boiler.

Bi HaiYang,Duanmu Lin,Zhu Yingxin
2007-01-01
Abstract:Aimed at the substitution of crude oil heating boiler in Wayi United Station of Liaohe oil field,proposed the plan of recovering the waste heat of oil field waste water to heat crude oil by using high-temperature heat pump,and optimized the modification plan,in this case,the payback period is 1.63 years,the modification can save 300×104 m3 natural gas per year or so.Lastly the paper points out that utilization of heat source of oil field waste water requires to solve further problems.
What problem does this paper attempt to address?