Abstract:How to realize the compatibility between the new substation automation system (SAS) based on IEC 61850 and the current SAS based on the conventional technology is an important problem when implementing IEC61850 in SAS. The current status of SAS is analyzed. A comparison between the current technology and IEC 61850 is made and it is pointed out that there will be a transitional period existing between the current system and the new system. Two kinds of strategy are proposed to implement the compatibility of the two systems in the transitional period.