Risk assessment methods of tunnel construction underpassing existing facilities

CHEN Jiejin,YANG Junsheng,ZHANG Yongjie,ZHANG Xuemin
DOI: https://doi.org/10.3969/j.issn.1672-7029.2013.04.016
2013-01-01
Abstract:According the principle of the disaster risk science,the risk index,F1,is related with tunnel factors and geological factors,and facivities themselves are regarded as vulnerability index,F2.Based on risk-rating system,the dangerousness and vulnerability assessment were analyzed separately,then were assigned to the appropriate index(or points) in accordance with certain principles.Through mathematical methods a subsystem or system index(or points) was obtained to quickly and easily estimate the relative risk level.
What problem does this paper attempt to address?