The analysis on the grain size variation of bed materials at Datong Hydrological Station and its response to the project constructions along the Yangtze River

He Jian,Pan Shao-Ming,Sha Hong-Liang,Chen Wang-Qin
2010-01-01
Abstract:According to the hydrological data(1977-2006) from Datong Hydrological Station,it was found that the majority of the bed materials were sands(94.48%) and silt(3.78%).Probability statistics and time series method such as Kendall method and sequential cluster method were used to analyze the grain size variation of bed materials at Datong Hydrological Station.The median diameter of bed materials has tended to increase gradually during 1977-2006.The grain size variation of bed materials is mainly in the form of jumping during 1977 to 2006,with 1980 and 1994 as its hopping sites of step on,and 2003 as its hopping site of step down.The jumping ranges are 11.4%,2.3% and-4.3% respectively.The change point analysis shows that the decline of suspended sediment concentration is the main reason for the coarsening of bed during 1977 to 2003,which is caused by water conservation projects(such as Gezhou Dam) as well as Soil and Water conservation focal harness project in the upper and middle reaches of Yangtze River and Protection Forest Project in the Yangtze River.Sediment carrying capacity of river flow increases with the decline of suspended sediment concentration,as well as the riverbed erosiveness,which can promote the exchange between suspended sediments and bed materials.Since 2003,the grain size of bed materials has tended to decrease,which is possibly influenced by the Three Gorges Reservoir.
What problem does this paper attempt to address?