Berth allocation and quay crane assignment problem by multi-objective

Le Meilong,Yu Hang,Huang Wei
DOI: https://doi.org/10.3969/j.issn.1673-4807.2013.03.013
2013-01-01
Abstract:Berth allocation and quay crane assignment has an important effect on making harbor of the vessels.In order to solve the berth allocation and quay crane assignment problem in the container terminal,this paper established a multi-objective mixed-integer nonlinear programming model with the stay time of ships and the productive cost considered simultaneously.From the result obtained by Gurobi,we can find that the multi-objective method is much better than the single-objective method.
What problem does this paper attempt to address?