Waterline Extraction and DEM Reconstruction in Chongming Dongtan

ZHENG Zong-sheng,ZHOU Yun-xuan,JIANG Xue-zhong,SHEN Fang
DOI: https://doi.org/10.3969/j.issn.1004-0323.2007.01.007
2007-01-01
Abstract:Ground survey is restricted by the difficulty of access to wide-range and dynamic tidal flat.The lack of terrain handicaps exploration and development of tidal flat.In this article,we selected Chongming Dongtan as an experiment area.On the analysis of spectrum characteristics of multi-temporal remote sensing images(1999~2004),waterlines were extracted from different bands according to tidal conditions.The assignment of an elevation to the waterlines was performed according to two elevation survey profiles.The waterlines labeled elevation were used to construct TINs(Triangulated Irregular Networks).Then an interpolation for each grid elevation was performed in accordance with the associated triangle.Finally,quantitative check of the result was examined according as the other two measurement profiles.The results indicate that the standard deviation of the approach is 0.4 m and 0.7 m,respectively,which eliminates the effects of unavailable tidal height and discrepancy of waterlines on DEM precision.
What problem does this paper attempt to address?