Optimizing Design for Downhole Oil-Water Separation

QU Zhan-qing,LIU Jian-min,YANG Xue-yun
DOI: https://doi.org/10.3969/j.issn.1001-3482.2008.10.012
2008-01-01
Abstract:The technique of downhole oil-water separation is developed to resolve the problems appeared in high water cut stage.At the moment inverse submersible electric pump matched with hydrocyclone are used in the oilfield.According to harmony of oil-water separation system pressure and fluid,an optimizing design for submersible electric pump system by nodal analysis is given.The system design was performed based on the data of 113-6 well in Zhuangxi field.Calculation shows that the design scheme is reasonable and the separation system can satisfy the operation requirements.
What problem does this paper attempt to address?