Practice of Threes Same Time Construction Technology for Air Shaft of Yangliu Coal Mine

Xin-de LI
DOI: https://doi.org/10.3969/j.issn.1008-8725.2006.09.061
2006-01-01
Abstract:The freezing technology,the ground pre-grouting technology and the shaft lining engineering are successfully used in the air shaft of coal mine,opens the beginning of threes same time well construction technology used in Huaibei mining area.
What problem does this paper attempt to address?