IN-SITU STRESS MEASUREMENT AND PREDICTION ANALYSIS OF TUNNEL ROCKBURST IN WEST HUBEI

XIAO Ben-zhi,LUO Chao-wen,LIU Yuan-kun
DOI: https://doi.org/10.3321/j.issn:1000-6915.2005.24.012
2005-01-01
Abstract:The national key project,Yichang—Wanzhou Railway,passes through the limestone mountainous area in west Hubei;and many deep-seated tunnels are needed to construct.In order to optimize the design and guide construction,hydro-fracturing stress measurements have been conducted for many boreholes along Yichang— Wanzhou Railway tunnel line in west limestone mountainous area of Hubei Province.It can be concluded that the in-situ stress magnitude in this area is classified as middle to high level;and the direction of the maximal horizontal stress is near to East-West.Based on the in-situ stress results and four distinguish methods,which are engineering rock quality classification standard,Russenes method,Turchaninov method and Hoek method;rockbursts are predicted during tunnel construction in deep-seated and hard rock tunnel conditions;and large deformation are predicted during tunnel construction in deep-seated and soft rock tunnel condition.In order to avoid the disadvantage conditions,reasonable excavation method and safety precautions should be adopted during tunnel construction.
What problem does this paper attempt to address?