Initial Allocation of Emission Permits in the Condition of Administration Cell——A Case Study of Shaying River Basin

Zhang Xingyu,Huang Xianjin,Yu Shutong,Cheng Xushui,Wan Yi,Ma Li
DOI: https://doi.org/10.3969/j.issn.1673-1212.2009.03.004
2009-01-01
Abstract:Initial allocation of emission permits is one of the first job in the emission permits trading.In the condition that the auction and pricing selling of the initial tradable emission permits have obstacle in practice,it is deemed that free allocation of initial tradable emission permits has operation in academia and practice.In recent years,most researchers of emission permits have discussed the theory and method of the initial allocation,but have not paid attention to the initial allocation in the condition of administration cell.The research of initial allocation in the condition of administration cell can widen the spatial scales of emission permits problem and may reduce the disputes of water pollution between districts.This paper takes the Shaying river basin as example,following the water function zoning at watershed scale and the total limiting discharge of COD and NH3-N which established by Huaihe River Commission Ministry of Water Resources,then allocates the emission permits in administration cell level which in Shaying river basin of COD and NH3-N.By discussing this problem,the key of initial allocation in the condition of administration cell is to enhance the feasibility of policy and strengthen the cooperation of different administration cell and give attention to two or morethings of the impartiality between administration cell which along the river upstream and downstream.
What problem does this paper attempt to address?