Bottlenecks in Bernoulli Serial Lines With Rework

Stephan Biller,Jingshan Li,Samuel P. Marin,Semyon M. Meerkov,Liang Zhang
DOI: https://doi.org/10.1109/TASE.2009.2023463
IF: 6.636
2010-01-01
IEEE Transactions on Automation Science and Engineering
Abstract:The bottleneck (BN) of a production system is a machine with the strongest effect on the system's throughput. In this paper, a method for BN identification in serial lines with rework and Bernoulli machines is developed. The method can be applied using either calculated or measured data on blockages and starvations of the machines. For the case of calculated data, a technique for evaluating perfor...
What problem does this paper attempt to address?