Research of Shenzhen geological hazard assessment and early-warning system

JIN Jiang-jun,PAN Mao,WU Lun,QU Hong-gang,CONG Wei-qing
DOI: https://doi.org/10.3771/j.issn.1009-2307.2007.02.045
2007-01-01
Abstract:Since being set as especial district in 1980,Shenzhen has been changed from an out-of-the-way town to a modem city with four million people.But mass construction has destroyed the frangible geological environment,and has caused a lot of geo-hazard.In this paper,geological hazard assessment and early-warning flow is expatiated.The six steps of the flow are data predisposal,model base construction,hazard zoning,early-warning area partition,get mete-orologic and hydrological critical criterion,and release early-warning result.Then,geological hazard assessment index is established,and geological hazard assessment and early-warning models are analyzed.At last,architecture of hazard assessment and early-warning system is designed,functions of its subsystem are described,and topological structure of system running is explained.
What problem does this paper attempt to address?