Study on deformation monitoring of large span underground powerhouse during excavation process

Li Shouju,Wu Jinhua,Liu Yingxi,Wu Fengji
DOI: https://doi.org/10.3969/j.issn.1673-8993.2008.06.001
2008-01-01
Abstract:In combination with a practical construction project of pumped storage system of Baishan hydropower station,the deformation monitoring of large span powerhouse during excavation process is introduced in this paper.The monitoring instruments include multi-point displacement meter and convergence meter.With continuous advancing of excavation in the same construction layer,the ground stress is further released,the inward movement of rock walls of the underground powerhouse results,and the site deformation monitoring data play key roles in timely modifying support parameters and excavation plan.