The Karst Development Law on Nanjing Metro Line 3 and Its Impact on Construction

王宁,阎长虹,邵勇,郑军
DOI: https://doi.org/10.3969/j.issn.1005-6270.2011.06.026
2011-01-01
Abstract:The initial drilling survey revealed that there are many Caves along with Binjiang Road Station-- Wutang Village Station at the Nanjing Metro Line 3.Through the analysis of geological background, it is found that the karst was controlled by faults and tectonic movement significantly, the range of surface water runoff control the scale and depth of karst development. The size of cave is small, but the karst's quantity is many in study area. Theyhave certain hazards on the construction of Nanjing Metro Line 3.
What problem does this paper attempt to address?