Installation,Testing and Defect Eliminating Measures of Electric Energy Data Acquire System

Chen Xiaolu,Li Shaoyuan
DOI: https://doi.org/10.3969/j.issn.2095-1256.2013.03.024
2013-01-01
Abstract:Based on the introduction of structure of power user electric energy data acquire system,this paper sums up and sorts out the various fault phenomena which occur in the installation,testing and on-site use.From the aspects of management and technology,it gives the processing methods and gets good effects by eliminating the hidden troubles and taking the defect eliminating measures.Not only increases the date acquisition success rate of the system so that the system run more stable,but also solves the problem of system utility billing effectively.
What problem does this paper attempt to address?