Mechanical Calculation and Analysis on Repair and Reinforced Project in Yangzhanling Tunnel

CHENG Ya-dong,SHENG Ya-jun,HAN Tong-chun,WANG Fu-jian
DOI: https://doi.org/10.3969/j.issn.1004-5716.2006.07.081
2006-01-01
Abstract:Steel supports are used to remedy and reinforce the soft broken wall rocks in Yangzhanling tunnel.The relevant calculated models are established based on tunnel sections.Load structure method is used to calculate the internal stress in linings;moreover on the basis of this calculated result,a calibration is made on the stability of the reinforced tunnel.