A New Method of Selecting Location of Country's Transformer Substation Based on Fuzzy-AHP

Xu Jianjun,Yang Shiyan,Yuan Jun
DOI: https://doi.org/10.3969/j.issn.1673-3800.2009.01.018
IF: 1.63
2009-01-01
Electrical Engineering
Abstract:Selecting location of country's transformer substation is a import thing of electric power system layout.The location of transformer substation is direct effect the structure of electric structure,power supply and run economy.To fit for the science,selecting the location must allover arrangement and run safe and economy.Aiming at the question of many factors and difficult decision-making to select location of transformer substation,bring forward to apply fuzzy analysis hierarchy process to select location of transformer substation.It can avoid the question of disaccord of judgment matrix of analysis hierarchy process.Fuzzy analysis hierarchy process is a method of judgment.It's proceeding as follows:firstly,Build the fuzzy consistent matrix by building hierarchy structure chart.Then Synthesis all schemes to obtain the best location of transformer substation.To selecting the location of transformer substation,it must think all factors.As example:close the center of load,making the electric network even science,enter line and out line easy,fit for the economy,et al.Evaluate 110kV country's transformer substation location to obtain the best location.It must think of five factors:structure of electric network,outer condition of location,analysis of vest,difficult and easy degree of obtaining earth,special predominance.Through the computer the single order and all orders to obtain the final answer that a is the best location.Compare with the paper [4],they are the same answer.Verify this method validity and correctness.
What problem does this paper attempt to address?