Study on the Risk Cost and Risk Management of Engineering Project

LI Bing,YANG Cheng-yong,LU Jing-hui
DOI: https://doi.org/10.3969/j.issn.1672-0032.2006.04.012
2006-01-01
Abstract:According to the characters of engineering projects,the necessity and importance of risk management are put forward.From the concept of risk cost,the intrinsic relationship between risk cost and risk management is discussed.Then the necessity of risk supervision is introduced,and the way of how to deal with risk management is approached.
What problem does this paper attempt to address?