Field Experiment and Analysis of Vacuum-Preloading Stress-Release Ditch

俞建霖,龚晓南,金小荣,高海江
DOI: https://doi.org/10.3969/j.issn.1007-2284.2006.05.025
2006-01-01
Abstract:Based on summary of theoretical research of horizontal displacement and field experiment data in the vacuum preloading project, the concept of stress release ditch is introduced.Incorporated with test of horizontal displacement and subsequent settlement outside strengthening area in actual project that has been set stress release ditch,it is concluded that the influenced area of horizontal displacement and subsequent settlement extents to more than 27.5m outside the strengthening area.It is proved that horizontal displacement and subsequent settlement outside the strengthening area could sharply decrease through comparative analysis of field test data under three kind of boundary conditions,i.e.,the ordinary strengthening,installing cement mixing pile,and setting stress release ditch.Setting stress release ditch could also isolate and decrease the influence of vacuum preloading on the surrounding environment.
What problem does this paper attempt to address?