Nitrogen Removal from Secondary Effluent by Using Integrated Constructed Wetland System

Jibing Xiong,Guangli Guo,Qaisar Mahmood,Min Yue
DOI: https://doi.org/10.1016/j.ecoleng.2010.12.025
IF: 3.8
2011-01-01
Ecological Engineering
Abstract:The treatment capacity of an integrated constructed wetland system (CWS) that was designed to reduce nitrogen (N) from secondary effluent was explored. The integrated CWS consisted of vertical-flow constructed wetland, floating bed and sand filter. The vertical-flow wetland was filled with gravel, steel slag and peat from the bottom to the top. Vetiver zizanioides was selected to grow in the vertical-flow constructed wetland and Coix lacrymajobi L. was grown in the floating bed. The results showed that the integrated CWS displayed superior removal efficiency for nitrate nitrogen (NO3−-N), ammonia nitrogen (NH4+-N), nitrite nitrogen (NO2−-N), and total nitrogen (TN). The average NO3−-N, NO2−-N, NH4+-N and TN removal efficiencies of the integrated CWS were 98.83%, 95.60%, 98.05% and 92.41%, respectively, during the whole experimental operation. The integrated CWS may have a good potential for removing N from secondary effluent.
What problem does this paper attempt to address?