A polypropylene unit production optimization based on data mining and full factorial design

Zhang Yuntao,Xu Qianyong,Cheng Zhengjun,Li Weicun,Xie Yunying,Guo Zhengjun
DOI: https://doi.org/10.3969/j.issn.1001-4160.2012.11.019
2012-01-01
Abstract:After optimizing a production process of polypropylene device parameters by data mining technology, the unit has operated stabilization. Then the 2 3 full factorial design is used to choice the amount of catalyst and auxiliaries such as TiCl 4,(C2H5)3 Al and CMMS. Through analyzing the experimental results, the best catalyst and auxiliaries ingredients scheme is 95 g TiCl 4:0.9L(C2H5) 3 Al: 200g CMMS. To verify the optimization of the ingredients scheme, the experimental results show that the average of the polypropylene reactor yield has reached 3119.5 kg per reactor higher than the test period 263 reactors average production(3033.75 kg/reactor) 85.75 kg, the growth of about 2.83%.