Comprehensive Evaluation of Technical Performance of a Wastewater Treatment Plant
Li-zhen XING,Zhi-hui KOU,Yi-hui WU,Li-ying OU,Yu-mei GUO,Fang GUO,Guang-xue WU
DOI: https://doi.org/10.19853/j.zgjsps.1000-4602.2017.03.021
2017-01-01
Abstract:The technical performance of a wastewater treatment plant in Kunming was evaluated by methods of TPS,DPF and AHP from different perspectives,and based on the evaluation results,the three evaluation methods were compared.TPS statistical evaluation method focused on the single indicator analysis.The indicators comprised the removal rate,standard compliance rate,stability and removal load of pollutants COD,BOD5,TN,TP and NH4+-N.The evaluation results showed that the stability of effluent NH4+-N,BOD5 and TP was poor,but their standard compliance rates were more than 95%.The average effluent TN concentration was close to the limits,with the standard compliance rate of less than 95%.DPF comprehensive evaluation method emphasized on the overall performance evaluation and converted concentrations of each pollutant into COD equivalents.The evaluation results showed that the influent concentrations of pollutants were below the design standards,the removal load of pollutants was less than the design load,and the removal rates of pollutants basically met the design requirements.AHP comprehensive evaluation method took both the single indicator and overall performance into account by establishing an evaluation index system of removal rate,standard compliance rate,stability and removal load,with subjectivity.The evaluation results showed that the operating state was generally good,and the dry season was slightly better than the rainy season,but the standard compliance rate of TN was less than 95%.Through all the evaluation methods,TN should be focused on in future system operation management.