A New Approach of Backward Simulation Combined TOC for Hybrid Flowshop Scheduling of Grouped Jobs

LI Xiaofeng,SHI Jinfei,YAN Weiwu
DOI: https://doi.org/10.3969/j.issn.1005-2402.2008.01.034
2008-01-01
Abstract:The approach of backward simulation combined the theory of constrain (TOC) is proposed for HFS′ Scheduling of grouped jobs in this paper, in which backward simulation is used to get a schedule of HFS′ part before bottleneck stage and forward simulation is used to get a schedule of HFS′ part after bottleneck stage. The heuristic and all steps of this theory are listed. Since the approach both has the flexibility of simulation and have the optimization of TOC, it can not only work out a better schedule of HFS′ Scheduling of grouped jobs, but also reduce the time of operation.