Analysis Methods of Stress Adjustment Based on Stress Path and Plastic Assessment

CHEN Liang,CHEN Shou-gen,ZHANG heng
DOI: https://doi.org/10.3969/j.issn.1002-0268.2013.10.015
2013-01-01
Journal of Highway and Transportation Research and Development
Abstract:Analysis methods of surrounding rock stress adjustment and yield are discussed based on Lambe stress path,principal stress space and plastic assessment index.The stress adjustment characteristics of surrounding rock during tunnel excavating by long bench method in soft rock with high ground stress is investigated using finite difference software FLAC ~(3D),relying on construction of the western section diversion tunnels with chlorite schist surrounding rock at Jinping Ⅱ hydroelectric station.The analysis shows that(1)stress path expressed by principal stress space method and plastic assessment index method are more intuitive and accurate than using Lambe stress path method because of three principal stresses are considered;(2)stress adjustment of surrounding rock occurs mainly in the front and rear sides 1.5B away from the tunnel face in the process of excavation,and arch crown rock enters plastic state earlier than side wall and inverted arch.
What problem does this paper attempt to address?