Performance of the First Beam on Shenguang Iii Technical Integration Line

Wanguo Zheng,Xiaomin Zhang,Xiaofeng Wei,Feng Jing,Zhan Sui,Jinqing Su,Mingzhong Li,Zhitao Peng,Shaobo He,Bo Chen,Xiaodong Jiang,Chi Ma,Dongxia Wu,Liangfeng Guo,Lei Ding,Xiongjun Zhang,Kuixin Zheng,Haien He,Weibao Liu,Xiaoyu Yang,Dianyuan Fan,Weiyan Zhang
DOI: https://doi.org/10.1051/jp4:2006133121
2006-01-01
Abstract:Technical Integration Line (TIL), which is being constructed at CAEP, is the prototype of Shenguang III fusion laser facility. Experimental results during the first integrated tests on the first line demonstrate that the laser system architecture from master oscillator through the laser amplifiers can meet the requirement of TIL engineering design. In this paper, brief introduction of TIL and main experiment results are presented.