BOG pre-cooling numerical simulation at LNG transport pipeline

Lu Chao,Zhuan Rui,Yi Chongchong,Wang Wen,Lv Jun,Wang Lei
DOI: https://doi.org/10.3969/j.issn.1000-6516.2012.06.012
IF: 2.134
2012-01-01
Cryogenics
Abstract:According to BOG pre-cooling process of long distance LNG transport pipeline,one-dimensional flow heat transfer model was established to simulate pre-cooling process.The largest pipe temperature cool-down velocity was 10 K/h and compute step time was 10 s.Calculation result show that total cooling time was 30.25 h for 761.2 m LNG pipe cooled down to 154.5 K.Through cooling process,changing trend of pipeline temperature,BOG temperature,inlet BOG mass-flow and phenomenon at pipe diameter changing position were all analysed.Result show that different factor has different influence on the pre-cooling process.
What problem does this paper attempt to address?