A Study on the Application of Industrial Engineering to the Optimization of Material Moving and Loading for Automotive Productions

Wang Ning,Xu Wenxia
DOI: https://doi.org/10.3321/j.issn:1000-680X.2009.08.022
2009-01-01
Abstract:A standardized simulation analysis is performed on the route,motion and time of material moving by utilizing on-spot industrial engineering technique.The relationships between operation time and material moving distance for both cases of using hauler and forklift are studied,and hence the material moving efficiencies for both cases at different moving distances are obtained.The scheme is applied to the logistic plan of a production line in an automotive plant,and the results of calculation and verification show that a distance of 73 m is the demarcation of decision making for choosing hauler or forklift.